Aurgusrebate close for distributors
Rebate leak audit · arithmetic runs in your browser · nothing you type is sent anywhere

Put in four numbers you already know.
Get the arithmetic back.

This is not a benchmark and it is not a study. It takes your purchase volume, your programs, your reconciliation hours and your claim cycle, applies rates you set yourself, and shows every line of the multiplication. If a line looks wrong, change the rate until it matches what you believe — the page will follow you.

The arithmetic runs in your browser and nothing you type is sent anywhere. The host counts the visit — which page, how long on it, how far you scrolled, and the referring site — and never sees a figure.

Step 1 — your four figures

$
Not total revenue — only the spend that sits under a rebate, billback or co-op agreement.
programs
Count each supplier agreement as one program; separate co-op and growth agreements count separately.
hrs / month
Everyone who touches it: AP raising debits, accounting on accruals, whoever builds the spreadsheet.
days
Your normal cycle, not the worst case. If you don't know, take the median age of open claims.
Rebate cash at risk, one year
$28,000
at the rates in the table below — not a forecast
Bracket, low end
$3,400
each assumption at the bottom of its range, never above your own figure
Bracket, high end
$120,000
each assumption at the top of its range, never below your own figure
Annual rebate dollars in scope: $800,000
Average per program: $22,857
Cost of running it manually: $44,640/yr

Step 2 — the arithmetic, line by line

Column 2 shows the substitution at your rates; the three right-hand columns are the same formula run at the bottom of every range, at your figure, and at the top of every range. An end takes your own figure whenever that sits outside the bound, so the two ends always contain your column. Nothing is rounded before the sum.
Line The arithmetic Low Your dials High
Step 0 — rebate dollars in scopepurchases × blended rebate rate
1 — Uncashed claimsclaim required, never submitted or expired
2 — Tier and rate variancepaid at the supplier's tier or rate, not the contract's
3 — Quiet disputesdisputed, then closed with no recovery and no decision
Rebate cash at risklines 1 + 2 + 3
4 — Carrying cost of the cyclemoney you have earned but not collected
5 — Labour you already payhours × loaded cost, twelve months

On a narrow screen the table scrolls sideways inside its own box — every figure is still on the page, nothing is hidden.

Lines 4 and 5 are not leaks, and they are not added to the headline. Line 4 is the financing cost of your claim cycle — real money, but it is the price of the delay, not rebate dollars you failed to bill. Line 5 is a cost you are already paying in salary, so adding it to a "lost rebate" figure would double-count the problem and make the page less believable. They are shown because a controller usually wants to see both the cash and the cost.

Why the bracket is so wide. The low column puts every assumption at the bottom of its range at the same time, and never above the figure you dialled; the high column does the same at the top, and never below it. So the ends always contain your own estimate — move a dial to zero and the bottom of the range follows it down; set the bounds to zero as well and the whole bracket goes with them. Every assumption sitting at an extreme at once is unlikely, which is why this is a bracket and not a prediction. Narrow it by narrowing the bounds in the assumptions panel.

Step 3 — the assumptions, in plain English

Every rate on this page is a placeholder that you are expected to overrule. We are not telling you what these rates are in your business — we have no way to know, and there is no public dataset behind these numbers. The defaults were chosen to be small enough to be boring and large enough to be visible on a mid-size distributor's book. Move them until they match what your own close tells you; the arithmetic will follow.

%
Assumption. Set it to the rate you can read off your own agreements — or take last year's posted rebate income and divide by purchases. That gives a real number for your book, which beats ours.
%
Assumption. If every claim goes in inside the window, set this to 0 and the line disappears.
%
Assumption. Covers retro tiers measured on the supplier's shipment data and rate changes mid-year.
%
Assumption. Disputes that age off the report or get written off to clear an aging.
%
Assumption for line 4 only. Auto-credited programs don't wait for cash and shouldn't be financed.
$/hr
Assumption. Salary plus burden, not an agency rate. Your payroll knows the real number.
%
Assumption. Your borrowing rate or internal hurdle — whichever your CFO would use.
Advanced — the low and high bounds behind the bracket
These are the ends of the range, also assumptions. Widen them if you genuinely don't know; narrow them if you have one program you've reconciled by hand and can extrapolate from.

What this page does not claim

  • No industry benchmark. There is no study referenced here, no survey, no "typically 3–5%". We measured nothing, so we cite nothing.
  • No forecast of savings. This is your arithmetic at your rates. A tool that removed every unsubmitted claim would recover line 1 and part of line 2 — not the headline, and not this year's full run rate.
  • No customer evidence. We are not going to put a logo or a quote on this page. Whoever built it has no customer story to tell you yet, and pretending otherwise would be the first thing you'd check.
  • Not accounting advice. Everything about ASC 705-20 below is a general description. Your auditors own your specific treatment.
  • No collection of your figures. Nothing you type is sent anywhere: no form, no cookie, no storage, no request carrying a figure you typed. What the host counts is the visit — path, time on page, scroll depth, referring site, plus Cloudflare's web analytics — and it never sees a figure.

Where the money actually goes — four mechanisms, in close order

1

Missed tiers

Volume and growth rebates are usually measured on the supplier's shipment report, not on your purchase ledger. The two versions of "what you bought" drift apart for boring reasons: returns and warranty credits, drop-ship orders booked to a different ship-to, a branch acquired mid-year, an item number that was replaced. The supplier pays on their number. You accrue on yours. Nobody compares the two until someone asks why the rebate came in under plan — and by then the period is closed.

The tell: your rebate income lands consistently a few percent under the rate you can read off the agreement, and the explanation is always "returns".
2

Unsubmitted debit claims

Not every rebate arrives on its own. Co-op advertising, price protection, freight allowances and damage allowances are usually claim-based: the money is paid only if someone raises a debit memo or files in the supplier's portal, inside a window, in their format, with backup attached. It is administrative work with a deadline, done by whoever isn't busy that week. Small claims lose that contest first, which is why the missing dollars usually sit spread across a long tail rather than in one big item — and why a sample of ten claims won't find them.

The tell: a program with a healthy annual total but a claim log with gaps in the months when the team was closing or short-staffed.
3

Disputes closed silently

A claim gets short-paid, you dispute it, the supplier says they are researching it. Three closes later the dispute is still open on a spreadsheet with no owner, or it has vanished from the deduction aging because somebody cleared the line so the aging would agree. Either way there was never a decision — the claim simply stopped being mentioned. This is the expensive one because it looks like nothing: no exception report, no error, no follow-up task. A dispute that is closed has a reason. A dispute that disappears has none.

The tell: an aging report you can make agree, and a dispute log you can't.
4

The accrual that never trues up

The accrual is normally set from last year's rate or the budget rate. Actual credits arrive at the contract rate, on the supplier's schedule, in lumpy quarters. The difference sits in the rebate receivable or accrual until year-end, when someone trues it up — or writes it off because reconciling it contract by contract is a week of work nobody has. Under ASC 705-20, consideration received from a vendor is presumed to be a reduction of the price of that vendor's products, recognised against cost of sales as the related goods sell (with narrow exceptions). So an unclaimed rebate is not only missing cash: until someone reconciles contract to ledger, the accrual and the inventory cost on the same goods are both wrong.

The tell: a rebate accrual that only moves twice a year, and a true-up entry large enough that the auditors ask about it.

Why these four and not "bad data". Every one of them is a control gap with a name and an owner, in the order a close actually encounters them: the tier lands on the shipment report, the claim has to be raised, the short-pay has to be disputed, the accrual has to be trued. If you can say which of the four is yours, you don't need a software category to fix it — you need one program reconciled by hand, end to end, contract to ledger.

If the number is material

Don't start with software, and don't start with the whole book. Take the single program with the largest annual spend, pull its agreement, its claim log and its GL account, and reconcile them for one quarter: rate by rate, claim by claim, to the cent. Three things fall out of that exercise — the true rate you are contracted to, the claims that were never raised, and the accrual error. If the quarter reconciles cleanly, the page above was wrong about your business and you should set every dial to zero — and the bounds underneath them too, if you want the bracket to collapse with the dials; that is a good outcome and it takes an afternoon to learn.

If it doesn't reconcile cleanly, you will have a number you can defend to your auditors and to your CFO — and it will be your number, not ours.

Or send us one program and we will run that same reconciliation by hand

Forward one supplier rebate agreement, that program's claim log and its GL account to veera.jain@aurgus.com — or book 30 minutes at cal.aurgus.com. A person at Aurgus runs that quarter end to end — rate by rate, claim by claim, to the cent — and answers with the three numbers this page estimates: the rate you are actually contracted to, the claims that were never raised, and the accrual error.

One program, one reply, no software account to create. If you would rather keep it in-house, the method above is complete — it is the one we would use.

Part of Aurgus — $600/month, see aurgus.com/pricing/.